Porter Carpentry(321) 240-3996
Menu

The Two Finishes People Judge The Room By

Tile and paint are the last things to go on and the first things anyone looks at. Both are almost entirely about what happened before them — flat substrate, clean lines, proper prep. That is the part that takes the time.

What It Covers

  • Floor and wall tile: layout planned so cuts land where they are least visible, not at the doorway
  • Substrate prep — flat, solid and correctly prepared before the first tile is buttered
  • Grout, caulk at every change of plane, and edge trim on exposed tile edges
  • Interior painting including caulking, filling, sanding and priming before the colour goes on
  • Cutting in at ceilings, trim and corners by hand rather than relying on tape to save it
  • Trim, door and cabinet painting where the finish has to be smooth enough to look sprayed

Layout And Prep Are The Job

A tile layout is decided before any adhesive is mixed. Where does the full tile start, which wall gets the cut, does a grout line collide with the middle of the doorway. Get that wrong and no amount of skill setting the tile fixes it — the room reads slightly off and nobody can say why. Get it right and it looks inevitable.

Paint works the same way. Colour takes twenty minutes to choose and about ten percent of the labour. The rest is filling, sanding, caulking every gap in the trim, and priming the patches so they do not flash through the finish coat. Two coats over an unprepared wall costs less on the day and looks worse for years.

What It Costs

Tile and paint scope varies more than most work — a single room repaint and a full floor of tile are not comparable jobs. Work across the business runs $875 to $18,750, with a single room most often between $2,000 and $3,500. Square footage, tile size and how much prep the surfaces need decide it. Fixed written price, 25% deposit, and the walkthrough costs nothing.

Get a ballpark in under a minute →

Questions

Do you do tile and paint as part of a remodel, or on their own?

Both. On a kitchen or bathroom it is part of the same job with the same person seeing it through, which is why the tile lines up with the cabinetry. As standalone work — a repaint, a backsplash, a tiled floor — it is priced and scheduled the same way.

How long before I can use a tiled floor?

Adhesive and grout both need cure time, and rushing it is how tiles come loose and grout cracks. Expect the room to be out of use for a day or two after the last grout depending on the product and the weather. It is in the written schedule so nobody is guessing.

Do you move furniture and cover everything?

Yes. Furniture moved or covered, floors protected, and the site cleaned at the end of each day. It is your house being lived in while work happens, not a job site you visit.

Related work

Free walkthrough, honest number, no charge to show up.